Top-down drone view of a long open trench through red-soil rangeland with scattered green brush.

Where we work

Water and wastewater engineering in San Antonio, Texas

Water and wastewater engineering in San Antonio, TX: SAWS service, TCEQ and Edwards Aquifer plans, and site civil design for developers and utilities.

Water and wastewater engineering in San Antonio

MES provides water and wastewater engineering in San Antonio and across Bexar County. We design water lines, sewer lines, lift stations and small treatment systems for new development.

We also prepare site civil plans for grading, drainage and utility connections. We work for developers and builders, utilities and municipalities, and chains that open sites in many cities.

MES is a licensed civil engineering firm with its headquarters in McKinney, Texas, and 525+ completed projects.

How permitting and review work in San Antonio

San Antonio Water System (SAWS) provides water and sewer service across most of the city. For a new tract, a SAWS Utility Service Agreement sets the infrastructure needed and reserves capacity. A Service Availability Letter shows the existing lines near a tract.

The City of San Antonio Development Services Department reviews plats, site plans and permits for projects in the city.

North Bexar County sits over parts of the Edwards Aquifer recharge, transition and contributing zones. In a regulated zone, TCEQ must approve an Edwards Aquifer protection plan before construction starts.

TCEQ also reviews public water and sewer designs and wastewater discharge permits. For sites with industrial wastewater, a 210E reclaimed water authorization can let the site reuse its treated water instead of discharging it.

Work in and near San Antonio

MES has finished civil site plans for three drive-up water kiosk sites in San Antonio. A fourth site, in Leon Valley, is in progress. These sites are part of a kiosk site program that spans seven states. Read more about our kiosk site planning.

Up I-35 in San Marcos, MES secured a 210E reuse authorization for a development with industrial cooling and washout flows. See also our pages for New Braunfels.

Common questions

Do I need a SAWS Utility Service Agreement?

Often, yes, when a new tract needs new mains or reserved capacity. Many projects start with a Service Availability Letter to see what lines are already there.

Is my site over the Edwards Aquifer recharge zone?

Check the TCEQ Edwards Aquifer map viewer. If the site is in a regulated zone, plan for TCEQ review of a protection plan before construction.

How do I start a project with MES?

Call (214) 833-6748 or send us your site details. Tell us the address, the use and what the city or SAWS has asked for so far.

Projects

Work in Texas

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.