
Four miles of waterline moved clear of TxDOT IH-20 work while Bitter Creek customers kept water service.
Bitter Creek Water Supply IH-20 waterline relocation
Where we work
Water and wastewater engineering in San Marcos, TX: TCEQ permits, 210E reuse, Edwards Aquifer plans and utility design for developers and districts.
MES provides water and wastewater engineering in San Marcos and across Hays County. We design water and sewer lines, lift stations, and wastewater treatment and reuse systems for new development.
We work for developers and builders, and for cities and small water districts. For public clients, we prepare plans and reports for capital projects, including projects that seek Texas Water Development Board financing such as the state revolving funds.
TCEQ reviews public water system designs, wastewater system designs and wastewater discharge permits.
Part of San Marcos sits over the Edwards Aquifer recharge zone. In a regulated zone, TCEQ must approve an Edwards Aquifer protection plan before construction starts.
Discharge permits near the San Marcos River can face close scrutiny and public opposition. For sites with industrial flows, a 210E reclaimed water authorization can let the site reuse its treated water instead of discharging it to a stream.
The City of San Marcos reviews plats and site plans inside the city and provides water and wastewater service across much of it. Confirm the service provider for your tract early.
In San Marcos, MES secured a TCEQ 210E authorization for a 1.0 MGD zero-discharge reuse system at a mixed-use data center development. The reclaimed water irrigates the campus and supplies fire protection.
Nearby, in Caldwell County near Martindale, MES took a 2.0 MGD mixed-use development through the 210E pathway, with the treated water reused for off-site agricultural irrigation.
See also our page for New Braunfels.
It is a TCEQ authorization under 30 TAC Chapter 210, Subchapter E, which covers the use of industrial reclaimed water. The treated water is reused, for example for irrigation or fire protection, instead of being discharged.
It depends on where the site sits. Check the TCEQ Edwards Aquifer map viewer. A site in a regulated zone needs an approved protection plan before construction.
Yes. We plan and design water and wastewater improvements for districts and cities. Call (214) 833-6748 to talk about your project.
Projects

Bitter Creek Water Supply IH-20 waterline relocation

Mini-warehouse site entitlements and civil design in Georgetown, Texas
Site master plan and phase 1 civil set for a concrete contractor
Car wash site civil design in Fate, Texas
Industrial zero-discharge reuse in Taylor, TX, approved within 6 weeks of submission
1.0 MGD zero-discharge reuse for a mixed-use data center development
Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748