Corner of a brick retail building with metal awnings beside a concrete parking lot with a red fire lane curb.

Where we work

Water and wastewater engineering in Dallas, Texas

Water and wastewater engineering in Dallas, Texas. Utility design, lift stations, site civil work and TCEQ submittals from MES, based in McKinney.

What MES does in Dallas

MES provides water and wastewater engineering for projects in Dallas and across Dallas County. Our headquarters is in McKinney, north of the city.

We design water and sewer lines, lift stations and force mains. We do site civil work, such as grading, paving and drainage. We support projects through construction.

Civil firms can hand us the utility part of a job, or add our engineers when their own team is busy.

How permitting and review work in Dallas

Dallas Water Utilities runs the city's water and wastewater system. Mains built for private development must meet its standards.

The city's Planning and Development department reviews private development plans. Its engineering staff review water and wastewater plans against Dallas Water Utilities standards. Paving and drainage plans get their own engineering review.

Some parts of Dallas send wastewater to the Trinity River Authority's Central Regional Wastewater System. Other cities in Dallas County run their own review under their own standards.

TCEQ sets the state design rules for public water systems and for wastewater systems. A private treatment plant needs a TCEQ permit or other authorization. Sites with an industrial wastewater stream may qualify for a Chapter 210 reuse authorization.

Work nearby

In Seagoville, MES designed a 2-acre retail plaza with paving, grading, utilities, drainage and streambank stabilization. It is now built.

In Hutchins, we prepared a two-phase site master plan and phase 1 civil set for a concrete contractor. MES also has a drive-up water kiosk site under way in Garland.

Common questions

Who reviews water and sewer plans for a Dallas project?

Inside the city, the Planning and Development department's engineers review them against Dallas Water Utilities standards. Projects in other Dallas County cities go to that city.

Can MES work as a subconsultant to our firm?

Yes. We work for other engineering firms as well as developers, utilities and cities. Read about our overflow support.

Do you handle TCEQ permits for Dallas-area sites?

Yes. For a site that cannot reach a city sewer, we design the treatment plant and prepare the TCEQ application.

Projects

Work in Texas

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.