
Water treatment plant upgrades in Conifer, plus a capital improvement plan and plans for 40,000 feet of sewer and water line rehabilitation and replacement
Mountain Water and Sanitation District plant upgrades and line rehabilitation

Where we work
Water and wastewater engineering in Castle Rock, CO: water and sewer extensions, lift stations and site civil, with Castle Rock Water and CDPHE review.
MES designs water, sewer and site civil work for projects in Castle Rock and the rest of Douglas County. We work for developers, property owners, districts and other engineering firms.
Work here includes water and sewer main extensions, lift stations, grading and drainage, and small treatment plants where no sewer is close enough. Our Colorado office is in Golden.
Castle Rock is a home rule town and the Douglas County seat. Castle Rock Water runs the town water and sewer system, including its sewer lines and lift stations.
The town wastewater is treated by the Plum Creek Water Reclamation Authority, which Castle Rock shares with two neighboring metropolitan districts.
Land outside town limits is reviewed by Douglas County. Water and sewer there often come from a metropolitan district or a water and sanitation district.
Most of Castle Rock drains to Plum Creek and on to Chatfield Reservoir. A state control regulation limits phosphorus in that watershed, and the Chatfield Watershed Authority comments on wastewater site applications there. CDPHE makes the final site location and design decision.
East of Castle Rock in Elizabeth, MES led the design of a 10-inch waterline extension of about 4,600 feet to serve commercial growth. We reviewed contractor submittals and visited the site during construction. To the south, MES has completed drive-up water kiosk sites in Colorado Springs and Fountain as part of a multi-state kiosk program.
Inside town limits, Castle Rock Water. Outside the town, service often comes from a district, so we confirm the provider before design starts.
In most cases, yes. A lift station above 2,000 gallons per day needs CDPHE site location and design approval under Regulation 22. In the Chatfield watershed, the Chatfield Watershed Authority also comments on the site application.
Call (214) 833-6748 with the address and a site plan if you have one. We will confirm the provider and the review path.
Projects

Mountain Water and Sanitation District plant upgrades and line rehabilitation

Phippsburg and Milner wastewater plants and collection system

Town of Yampa wastewater plant and collection system

Town of Hayden water model, I&I analysis and grant plans

Mobile home park waterline replacement in Commerce City, CO

Drive-up water kiosk site program in seven states
Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748