Newsletter
Issues with Your Lagoon Systems? Here’s What You Need to Know
Explore essential tips and solutions for managing common issues in your lagoon systems for improved water quality and efficiency.
Issues with Your Lagoon Systems? Here’s What You Need to Know
Facing Effluent Compliance Challenges?
All of the lagoon systems we interviewed had or are currently experiencing issues with meeting effluent requirements. Lagoon systems, which were once considered low-cost and effective, are now facing mounting compliance pressures due to stricter regulations from the Colorado Department of Public Health and Environment (CDPHE).
If your lagoon system receives multiple violations and fines from CDPHE, you’re not alone. Many systems are in the same situation. Compliance is not just about avoiding penalties—it’s about protecting water quality (opens in a new tab), ensuring the longevity of your wastewater treatment infrastructure (opens in a new tab), and avoiding worst-case scenarios like forced plant shutdowns.
What’s the Problem?
CDPHE is sending multiple violations and fines to lagoon systems that fail to meet effluent (opens in a new tab) requirements. These penalties will continue until the systems ultimately comply.
However, repeated non-compliance can lead to severe outcomes, such as:
Forced shutdowns of wastewater treatment plants (opens in a new tab) if regulatory standards are not met.
Loss of funding opportunities (opens in a new tab) or grants for future upgrades.
Significant environmental damage to nearby water bodies due to untreated or poorly treated effluent.
For many communities, the potential of having no operational wastewater treatment plant is a risk they cannot afford. Acting now is critical to avoid these scenarios.
How to Get Your Lagoon System into Compliance
Meeting regulatory requirements starts with understanding your options and implementing practical, cost-effective solutions. Here’s what lagoon operators can do to address compliance challenges:
Option 1: Demolish the Lagoon and Build a New Wastewater Treatment Plant (WWTP)
Pros:
Provides the most advanced and effective treatment capabilities, such as Sequencing Batch Reactors (SBR) or Membrane Bioreactor (MBR (opens in a new tab)) plants.
Cons:
Cost: Both the upfront capital costs and long-term operating expenses of a mechanical plant (opens in a new tab) are significantly higher than those of traditional lagoons.
Option 2: Modify the Existing Lagoon System
Many operators are finding success by upgrading their lagoon systems rather than replacing them entirely. These upgrades can include:
Enhanced Aeration Systems:
Improve dissolved oxygen levels to enhance treatment efficiency.
Clean or replace aeration equipment to maintain oxygen levels above 2 mg/L in treatment cells.
Sludge Management:
Regularly monitor sludge (opens in a new tab)depth and remove excess sludge when it exceeds 25% of the lagoon’s operating depth to restore capacity and prevent effluent violations.
Algae Control:
Implement shading techniques or floating covers to reduce sunlight exposure.
Increase aeration to inhibit algae growth and minimize pH and total suspended solids (TSS) violations.
Emerging Treatment Technologies:
Explore innovative approaches like micro-algae with electrocoagulation (opens in a new tab) for improved treatment efficiency.
Prevent Overloading:
Operate lagoons in parallel to reduce organic and hydraulic loads on individual cells.
By combining these strategies, lagoon operators can significantly reduce violations and improve system performance without the high costs of a complete system overhaul.
Watch our Podcast on Lagoon Solutions
For more engineering podcasts, visit mod-eng.com/efc
Take Action Now
Lagoon systems require proactive planning and maintenance to meet compliance standards. Don’t let violations, fines, or shutdown risks pile up.
Talk to an engineer
Tell us about your project
An engineer reads it
Not a salesperson. Someone who can tell you whether the pathway is real.
You get a first answer
Your options, the agencies involved and the questions that decide cost and schedule.
You decide
No commitment to have the first call.
Prefer the phone? (214) 833-6748