
Stormwater and Utility Coordination in McKinney’s High Growth Subdivisions: Avoiding the Common Redesign Trap
A subdivision layout that looks finished on paper, streets drawn, lots platted, detention pond dropped into the low corner of the site, can still be months from actually being buildable if nobody checked that layout against the utility routes it




















