
Archive, 2023 to 2025
Engineers for Communities podcast
An archive of episodes from 2023 to 2025: water and wastewater conversations with operators, town leaders and technology makers, many recorded at WEFTEC and CRWA.
Newest first
44 items
Containerized wastewater treatment: modular lagoon upgrades | WEFTEC Series 2, episode 11
Efficient pump and grinder systems for small community wastewater | WEFTEC Series 2, episode 10
Advanced water treatment: chlorination, flushing and real-time data | WEFTEC Series 2, episode 9
Simplifying screening design and process | WEFTEC Series 2, episode 8
Tracking and solving inflow and infiltration (I&I) challenges | WEFTEC Series 2, episode 7
Energy Solutions for Water and Wastewater Treatment Facilities | WEFTEC SERIES 2 | EP 6
Future-proofing wastewater systems for rural communities | WEFTEC Series 2, episode 5
Real-time water quality monitoring for WWTP operators | WEFTEC Series 2, episode 4
Wastewater Solutions for Developers and Operators | WEFTEC SERIES 2 | EP 3
PFAS removal using aqueous electrostatic concentrators | WEFTEC Series 2, episode 2
Addressing Small System Challenges with Water and Wastewater Experts | WEFTEC SERIES 2 | EP 1
Water System Repairs: From Tanks to Underground Pipes | CRWA SERIES | EP 11
Wastewater Residuals: Managing Evolving Regulations | CRWA SERIES | EP 10
Ambiente H2O’s specifiable solutions for water and wastewater | CRWA Series, episode 9
Grouting & Imaging Solutions in Sewer Lines and Manholes with CUES | CRWA SERIES | EP 8
Importance of Regular Maintenance and Inspection of Water Storage Tanks | CRWA SERIES | EP 7
Funding insights and rural water system challenges with CRWA’s grants manager | CRWA Series, episode 6
Lagoon optimization with microalgae and electrocoagulation | CRWA Series, episode 5
Chemical-Free Ultrasonic Algae Control for Wastewater Lagoons and More | CRWA SERIES | EP 4
Lagoon pilot: bioaugmentation, microalgae and electrocoagulation | CRWA Series, episode 3
Maximizing Collection System Performance: Targeting I&I with Sensor Data | CRWA SERIES | EP 2
Simple Wastewater Solutions for Small Municipalities | WEFTEC SERIES | EP 12
Teledyne’s non-contact laser flow monitoring, sampling and data | WEFTEC Series 1, episode 11
Bead Filters: Low-Maintenance with Dual Biological & Mechanical Filtration | WEFTEC SERIES | EP10
Iron and manganese filtration in water treatment | WEFTEC Series 1, episode 9
Advanced screening techniques for wastewater challenges | WEFTEC Series 1, episode 8
Strategic management of water and wastewater systems with Hayden’s town manager | WEFTEC Series 1, special episode
Pre-engineered wastewater solutions with membrane bioreactors (MBR) | WEFTEC Series 1, episode 7
Pump applications: positive displacement, centrifugal and grinders | WEFTEC Series 1, episode 6
Sludge reduction, grit removal and cost-saving dryers | WEFTEC Series 1, episode 5
Show 14 older items
- Mixers, polymers and on-site chlorine generation | WEFTEC Series 1, episode 4WEFTEC Series ·
- Efficient solutions for PFAS removal | WEFTEC Series 1, episode 3WEFTEC Series ·
- Cost-effective processes for wastewater from collection to treatment | WEFTEC Series 1, episode 2WEFTEC Series ·
- How to reduce the operating cost of reverse osmosis systems | WEFTEC Series 1, episode 1WEFTEC Series ·
- Insights for Colorado’s water and wastewater providers | Episode 14Podcast ·
- The Cloacina story: package wastewater treatment plants | Episode 13Podcast ·
- Lift stations 101: why they matter to community development | Episode 12Podcast ·
- How inflow and infiltration affect your collection system and treatment plant | Episode 11Podcast ·
- The importance of detailed water loss analysis | Episode 9Podcast ·
- From EOD to H2O hero: Christopher Martin on rural water tanks and grants | Episode 7Podcast ·
- How He Replaced A 50-Year-Old “Temporary” Wastewater Treatment Plant | EP 5Podcast ·
- Managing rural Colorado construction projects, and what CMAR means | Episode 4Podcast ·
- Electrocoagulation for small Colorado lagoons | Episode 3Podcast ·
- How a five-minute search saved a Colorado community $8 million | Episode 1Podcast ·