
A 2.0 MGD 210E reuse authorization in 4 weeks, where nearby discharge permits took 30+ months
2.0 MGD reuse authorization for a data center and batch plant development near Martindale, Texas

525+ projects. A selection, with the facts.
Selected work

2.0 MGD reuse authorization for a data center and batch plant development near Martindale, Texas

1.0 MGD zero-discharge reuse for a development with industrial flows

Industrial zero-discharge reuse in Taylor, TX, approved within 6 weeks of submission

Business park reuse after a county septic denial in Taylor, TX

Mountain Water and Sanitation District plant upgrades and line rehabilitation

Phippsburg and Milner wastewater plants and collection system

Town of Yampa wastewater plant and collection system

Bitter Creek Water Supply IH-20 waterline relocation

Grading and drainage plan for a new single-family home in Texas

Town of Hayden water model, I&I analysis and grant plans

Ranch water system model and fire memo

Mobile home park waterline replacement in Commerce City, CO

Septic and stormwater design for a Johnson County, Texas site
Ice vending site permits across Arizona and Florida


Mini-warehouse site entitlements and civil design in Georgetown, Texas

Drive-up water kiosk site program in seven states

Site master plan and phase 1 civil set for a concrete contractor

City of Cripple Creek sewer model and collection system design
Car wash site civil design in Fate, Texas

Cabin development civil design in Kremmling, Colorado

2-acre retail plaza with streambank stabilization in Seagoville, Texas

48-lot subdivision with a future industrial site in Lindsay, Texas

2.67-acre office and retail center on I-35 in Corinth, TX

10-inch waterline extension for commercial growth in Elizabeth, CO


Replacement 10,000 gpd wastewater plant for a private school

Replacement 40,000 gpd wastewater plant for a growing RV park

Florissant Water and Sanitation District lift station and collection system

RV park lift station sized for three phases in Milford, Texas


Morrison Creek wastewater plant, water tank and booster station

Arabian Acres Metropolitan District water treatment and distribution

Prairie Corner wastewater lift station, Brighton, Colorado

Last Dollar PUD HOA wastewater treatment improvement

Outdoor learning area grading for Jefferson County Public Library

Six-home infill site on 0.75 acres in Lakewood, Colorado
Where the work is
One dot per city, sized by the number of projects there.
| State | Projects | Cities |
|---|---|---|
| Texas | 81 | Houston (11), Austin (4), McKinney (4), San Antonio (3), Alvarado (2), Bryan (2), Edinburg (2), Georgetown (2), Hidalgo (2), Katy (2), Alice, Anna, Arlington, Bay City, Baytown, Beaumont, Borger, Brownsville, Crystal City, Dallas, Dripping Springs, Eastland, Euless, Floresville, Fort Stockton, Fort Worth, Freeport, Gatesville, Greenville, Hereford, Humble, Irving, Italy, Kingsbury, La Porte, Lago Vista, Lakeway, Livingston, Melissa, Milford, Odessa, Palmview, Pampa, Princeton, Rockdale, Rollingwood, San Marcos, Schertz, Spring, Stafford, Sulphur Springs, Sweetwater, Taylor, Waco, Weslaco, West Columbia, Wichita Falls |
| Colorado | 41 | Denver (7), Steamboat Springs (4), Lakewood (3), Aurora (2), Oak Creek (2), Pueblo (2), Colorado Springs, Commerce City, Cripple Creek, Evans, Florissant, Fort Morgan, Fountain, Glenwood Springs, Golden, Greeley, Greenwood Village, Gypsum, Indian Hills, Keenesburg, Kremmling, Leadville, Milliken, Sheridan, Thornton, Westminster, Wolcott |
| Florida | 26 | Tampa (3), Melbourne (2), Winter Park (2), Apopka, Bartow, Belle Glade, Beverly Hills, Brooksville, Dade City, Delray Beach, Eustis, Holiday, Lake Placid, Moore Haven, New Port Richey, Orlando, Sebring, Spring Hill, St. Petersburg, West Palm Beach, Winter Haven, Zephyrhills |
| California | 17 | Los Banos (2), Modesto (2), Stockton (2), Compton, Folsom, Fresno, Hanford, Highland, Indio, Lindsay, Oakdale, Roseville, Sacramento, Stanton |
| Arizona | 9 | Kingman (2), Phoenix (2), Buckeye, Fort Mohave, Glendale, Rio Verde, Yuma |
| Nevada | 5 | Las Vegas (4), Henderson |
| WA | 5 | Arlington, Donald, Maple Valley, Port Orchard, Spanaway |
| New Mexico | 1 | Las Cruces |

What clients say
Exceptional service from start to finish. Their team understood our development timeline and worked around it. The wastewater plant design was exactly what we need and was approved on time.
Modern Engineering Solutions was great to work with as we had to replace the entire water system within the MH community we own. Mike and his team performed all the engineering work necessary to get the job done. Well done!
We had a great experience working with Modern Engineering Solutions on the single-family homes subdivision project. Mike and his team were very professional, cohesive, and worked well together. We were able to complete the project on time and within budget. I would definitely recommend them to anyone looking for sub division designs!
I'm very happy with the wastewater treatment services I've received from MES. Michael is very professional and always willing to help, no matter how big or small the issue. The pricing is also very reasonable, which is a huge plus.
I've teamed up with Modern Engineering Solutions on several projects with great success. Michael is a very experienced civil engineer with a broad knowledge of all civil engineering aspects.
I have used Modern Engineering Solutions for grading designs on a few occasions and have always been happy with the work I have received. His team is very knowledgeable and professional, and they were able to turn around my plans quickly and without any issues.
Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748